Cameco

This link is provided as an additional source of information solely for the convenience of the reader. By accessing this link, you will be leaving Cameco’s U101 website. Cameco assumes no responsibility for the accuracy or completeness of information it provides or the security of this third-party website.

You will be directed to http://www.nrc.gov/materials/fuel-cycle-fac/fuel-fab.html in 10 seconds,
or click the "Proceed" button to be redirected immediately.

Proceed
It would take at least 33,750 wind turbines with a capacity of 2 MW each to replace the current generating power of Canada’s nuclear fleet. That would equate into a wind farm covering at least 8,733 square km – about half the size of Lake Ontario.